Yes
A state-of-the-art Centre of All-Weather Synthetic Pitches (6 X 6 a side and 1 X 10 a side) Olympic standard water based hockey pitch (home of Hockey Ireland) Recently installed 2 tennis courts and Ireland’s first ever Beach Sport Centre. The building consists of changing rooms, offices and 2 multi purpose meeting rooms. Car parking for 120 cars
RETROFIT OF ALL EXTRNAL LIGHTS OF THE FACILITY TO LED. THIS INCLUDED ALL PITCH LIGHTING, WALKWAYS, FOOTPATHS AND CAR PARKS. PROJECT WAS COMPLETED OVER 6 WEEKS SECTION BY SECTION SO AS TO AVOID ANY CUSTOMER DISRUPTION
Technical innovation
184 000
no
5 YEARS ROI AND 10 YEARS USEFUL LIFE
A VERY STRAIGHT FORWARD SWAP OUT PROCESS
NO IMPACT ON CUSTOMERS
IMMEDIATE IMPACT OF THE NEW LIGHTS ONCE INSTALLED
HARD TO FIND SUITABLE CONTRACTORS
COST RELATED TO THE H&S DUE TO WORKING AT HEIGHT WAS SIGNIFICANT
A LARGE COMPOUND FOR MATERIALS AND WASTE WAS REQUIRED
| Indicator | Value |
|---|---|
| Visits per year | 162,515 total visits for football |
| Water Consumption (liters/use) | |
| Primary energy Usage per year (kWh/use) | 0.53 |
| Estimation of Water Saving (%) | Low (below 30%) |
| Estimation of Energy Saving (%) | Low (below 30%) |
| Estimation Waste and Resource Savings (%) |
IN Q2 OF 2026 WE WILL BE REMOVING ALL MICROPLASTICS FROM THE SYNTHETIC PITCHES AND REPLACING ALL PITCHES WITH AN ORGANIC INFILL SOLUTION.