Volver

CEM Can Felipa


...

Sport facility type

  • Indoor sports centre

Is the facility part of the sports complex?

No


Description

Sports center with a 25x16.5m pool, fitness room, two group activity rooms, sauna, solarium, and a health services area.


Size

  • Indoor Space: 2 500 m²
  • Outdoor Space: 300 m²

Other relevant information


Sustainability pillars of the innovation'

  • Energy
  • Water
  • Governance

Subcategories

  • Lighting: Installation of LED lighting, presence or brightness control systems.
  • Insulation: Efficient insulation systems for walls or windows
  • Water savings: Measures for water saving or rainwater recovery. Measures to improve wastewater quality.
  • Certification: External sustainability certifications.
  • Resourcing: Sustainability roles and or teams.

Innovation description

- Change of lighting to LED - Insulation of ACS and ACSH pipes - Water flow regulation using aerators - Boiler temperature regulation to meet Legionella reference temperatures for each season - Adjustment of WC flush water capacity by regulating the filling float and installing a dual flush system.


Innovation Type

Technical innovation


Approximate cost of investment in innovation (in €, excluding VAT)

45 000 €


Aid or subsidy to encourage the implementation of the innovation

No


Years for the return on investment (ROI)

None


Pros of the Innovation

1. Energy and consumption savings
2. Increased system efficiency
3. Reduced environmental impact

Cons of the Innovation

1. Initial investment
2. Possible reduction in comfort (decreased water pressure)
3. Equipment adaptation


Facility Indicators

Indicator Value
Visits per year 380 000
Water Consumption (m³/visit)
Primary energy Usage per year (kWh/m2)
Water Saving (%)
Energy Saving (%)
Waste and Resource Saving (%)

Other Indicators

  • LED lights

Interest in a specific need that can be addressed by a company offering an innovative sustainability solution.

Our center will undergo an expansion and improvement of its spaces within a couple of years. The new project already includes all the sustainability solutions currently required in public works. Until this expansion takes place, it is difficult to incorporate new innovative systems due to the limited time available for their amortization.


    General Information

  • Country

    Spain

  • Address

    Plaça Josep Mª Huertas Claveria nº1

  • Owner

    Ajuntament de Barcelona

  • Manager

    Fundació Poblenou 1924

  • Date of building

    1989

    Contact Details

  • Mail

    canfelipa@canfelipa.com

Last update: 3 de marzo de 2025 a las 17:05