Sports center with a 25x16.5m pool, fitness room, two group activity rooms, sauna, solarium, and a health services area.
- Change of lighting to LED - Insulation of ACS and ACSH pipes - Water flow regulation using aerators - Boiler temperature regulation to meet Legionella reference temperatures for each season - Adjustment of WC flush water capacity by regulating the filling float and installing a dual flush system.
Technical innovation
45 000 €
No
None
1. Energy and consumption savings
2. Increased system efficiency
3. Reduced environmental impact
1. Initial investment
2. Possible reduction in comfort (decreased water pressure)
3. Equipment adaptation
Indicator | Value |
---|---|
Visits per year | 380 000 |
Water Consumption (m³/visit) | |
Primary energy Usage per year (kWh/m2) | |
Water Saving (%) | |
Energy Saving (%) | |
Waste and Resource Saving (%) |
Our center will undergo an expansion and improvement of its spaces within a couple of years. The new project already includes all the sustainability solutions currently required in public works. Until this expansion takes place, it is difficult to incorporate new innovative systems due to the limited time available for their amortization.